PVE Cranes Dubai Canal

The project will extend Dubai Creek from Business Bay across Sheikh Zayed Road, through Safa Park and across the two main arteries in Jumeirah to reach the Arabian Gulf.Construction on the Dubai Water Canal Project has been split across three phases.The first includes the construction of bridges across the canal on Sheikh Zayed Road, comprising eight lanes in each direction. The bridges will rise eight meters to allow free navigation of water transport vehicles in the canal.The second phase will see the construction of bridges across the canal, across three lanes on Jumeirah Beach Road and two lanes on Al Wasl Road in each direction.Additionally, a flyover from Al Wasl Road, linking Al Hadiqa Road in the direction of Sheikh Zayed Road will also take form.The third and final phase will see the actual construction of the 3.2 km-long canal, with the inclusion of a beach, a marina for boats and the water bus, along with three pedestrian bridges above the canal to link the Jumeirah Beach Walk with Safa Park Walk.